DCM Boards (Daily Capacity Management)

DCM Boards provide a visual time-grid for daily capacity planning. Resources (people, equipment) are arranged as rows, time slots as columns, and tasks are placed as colored blocks on the grid. This gives shift leads and team leaders an instant view of who is doing what, when, and whether capacity is fully utilized.

The module is inspired by the physical capacity boards used in lean manufacturing, digitized for real-time collaboration and historical tracking.

Overview​

Daily capacity management is a core discipline in operational excellence. Without visibility into who is assigned to what, teams experience bottlenecks, idle time, and missed commitments. ProBeya's DCM module solves this with a digital grid that supports drag-and-drop task assignment, utilization heatmaps, and reusable task catalogs.

Getting Started​

  1. Navigate to your board and open the DCM panel.
  2. Click New DCM Board and configure the date, shift type, and time range.
  3. Set the slot duration (e.g., 15, 30, or 60 minutes).
  4. Add resources (rows) — each resource has a name, role, and available minutes.
  5. Add tasks (blocks) — assign them to resources at specific time positions.
  6. Use the utilization view to spot over- or under-allocated resources.

How It Works​

Board Structure​

Each DCM board represents a single date/shift combination with configurable parameters:

FieldDescription
DateThe calendar date for this capacity plan
Shift TypeMorning, afternoon, or night shift
Start/End HourConfigurable time range (e.g., 06:00 to 14:00)
Slot DurationTime granularity in minutes (e.g., 15, 30, 60)

Resources​

Resources are the rows of the grid. Each resource represents a person or equipment unit with:

  • Name — resource identifier
  • Role — functional role (e.g., "Operator", "QC Analyst")
  • Available Minutes — total capacity for the shift
  • Sort Order — display position on the board

Tasks​

Tasks are the blocks placed on the grid. Each task is positioned by:

  • Resource — which row (resource) the task belongs to
  • Start Minute — offset from the board's start hour
  • Duration — length in minutes
  • Color — visual category coding
  • Status — tracking completion within the shift

Tasks can be moved between resources and time positions via the moveTask procedure, enabling real-time capacity rebalancing.

Task Catalogs​

Frequently recurring tasks can be saved in a task catalog scoped to the organization. Catalog entries store a default name, duration, color, and category. When adding tasks to the grid, users can pull from the catalog to avoid retyping common assignments.

Utilization Analytics​

The getUtilization procedure calculates per-resource utilization:

Utilization % = (Assigned Minutes / Available Minutes) x 100

This powers a capacity heatmap showing which resources are over-allocated (red), optimally loaded (green), or under-utilized (yellow).

Configuration​

DCM boards are linked to a parent ProBeya board. Multiple DCM boards can exist for the same parent board (one per date/shift). Time parameters and slot duration are set per DCM board.

Permissions​

ActionRequired Role
Create a DCM boardBoard manager or shift lead
Add/move/remove tasksAny board member
Add/remove resourcesBoard manager
Manage task catalogOrganization admin
View boards and utilizationAny board member

Board creation and deletion are logged to the audit trail.

Tips & Best Practices​

Build a task catalog early

Invest time upfront in creating a comprehensive task catalog with accurate default durations. This dramatically speeds up daily planning and ensures consistency across shifts.

Review utilization daily

The utilization heatmap should be reviewed at the start of each shift. Flag any resource above 90% utilization as a risk — they have no buffer for unplanned work.

Use colors meaningfully

Assign consistent colors to task categories (e.g., blue for production, red for maintenance, green for training). This makes the grid scannable at a glance.

  • Shift Handover — capacity context complements shift handover communication
  • TIER Meetings — review daily capacity during TIER stand-ups
  • KPI Boards — track utilization and capacity KPIs over time
  • Action Log — create actions for capacity gaps identified during planning